How it works
From spec sheet to site
The process
Source Smarter. Procure with Confidence.
What to send us
A part number is ideal. A drawing is just as good. A photograph of the existing nameplate is usually better than a typed description, because it carries the rating, serial and manufacturer in one image.
Have a whole outage list? Paste it in one go — cells copied from Excel work as they are. We match your lines against the catalogue automatically; anything we cannot match is added as a special order in the same order.
For runners, gates, penstock and other engineered items we need site conditions — net head, design flow and rated output. Without those, nobody can quote, including the original manufacturer.
We reply within one working day — sooner if your plant is down.
What a price includes
Everything that applies, written out. Your quotation lists every item, adds the VAT on its own line and states the delivery terms — customs duty, transport, packing — in full. Its grand total is what you pay; nothing is added at invoice time.
Prices arrive in your quotation — costs move with metal prices and freight, so we confirm the number at the moment you ask rather than publish one that may have drifted. Either way, the grand total is what you pay.
Payment
Bank transfer or letter of credit, against a proforma invoice. We do not take card or wallet payment — at these ticket sizes it is the wrong instrument and the fees would come out of your price.
Delivery
We clear customs and arrange transport to site, including districts that need a transhipment. Lead times on the catalogue exclude clearance, which typically adds a week at Birgunj and longer if documentation is queried.
Special orders
Not in the catalogue?
The catalogue is the part of our range that carries a published price — not the limit of what we source. Every category page and the search box offer a special-order path: describe the item, attach what you have, and we come back with a quotation like any other.
Request a special order